Major Strategies, Resource Needs, and Flexible Financial Planning
Major Strategies and Resource Needs
Five major strategies for CGTC emerged from the planning process:
- to lead the state in offering programs that are ahead
of the curve and on a higher level of learning
by the addition of advanced programs that are intended to meet
expanding needs for post-degree study in information technology,
medical, and other professional technical fields;
- to offer a market-driven program mix that expands the CGTC curriculum
into new and emerging programs areas that reflect current and
future employment market demands;
- to continue to create a significant educational presence throughout
the service area by expanding capacity to deliver programs and
services in all
eight seven CGTC counties;
- to begin development and implementation of the weekend-college
concept; and,
- to implement a comprehensive technology and technology infrastructure
program for all CGTC functions, both instructional and operational.
Most of the colleges improvement and expansion needs have
been reflected in the most recent Performance Accountability System
(PAS) budget request, the four-year plan for use of federal funds,
and the annual capital outlay budget request; however, some of CGTCs
new strategies have not yet been fully incorporated into these budgets.
Therefore, future budgets should include existing needs and should
address any additional resource needs discussed in the major strategies
below.
Post-Degree Programs
To introduce post-degree technology programs that go beyond
the baseline of traditional entry-level programs, resources
will be needed for the first year of operation equaling approximately
$836,500 as follows:
- $25,000 to rent or renovate instructional space,
- $500,000 to equip the classroom and laboratory space (to be
completed one year in advance),
- $300,000 for four additional faculty and two addition student
services personnel, and
- $11,500 for program marketing and advertising.
In the second year, resources for two additional faculty and one
additional student services worker will be needed in addition to
the continuing costs from the previous year. As the demand for post-degree
programs grows in the third and fourth year of their operation,
and as new programs are added to meet needs, additional resources
will be needed each year to expand faculty and staff, to provide
additional renovated/rented space, and to provide retrofitted and
equipped classrooms and labs. It is anticipated that CGTCs
post-degree programs will be in high-demand technology, medical,
and other fields. It is projected that there will be a rapidly growing
demand for these programs in Baldwin, Bibb, Monroe, and other counties
throughout the service area.
New and Emerging Programs
New and emerging programs will reflect advances in a diverse array
of technologies and career fields, with special emphasis on information
technology and medical fields. Information technology programs may
include advanced areas such as wireless technology, network design,
PDAs, home networking and communications, streaming audio/video,
network security, specialized programming, and/or other technological
areas. Medical programs will also mirror the latest advances in
the field. IT programs will be designed and delivered to cover the
spectrum of career levels within a technology field from users/operators,
to technical support, to technology administration, to technology
design and development levels. A similar progression of levels will
apply to development and delivery of programs for emerging medical
careers and other advanced fields. Resource needs for the delivery
of new programs to meet emerging market demands will be significant;
however, many of the needs have already been reflected in the most
recent PAS budget request. New programs that have already been included
in PAS include: Environmental Horticulture, Forestry, Hospitality
and Tourism, Metrology, Criminal Justice, Distribution and Materials
Management, and it is anticipated that Fire Science, Cardiovascular
Technology, Dental Hygiene, and others will be included in the next
PAS request. Other program needs are being integrated into the budgets
for personnel and equipment costs for new construction and renovated
facilities. As new space is designed, the resource requirements
for new and emerging programs will be included in the facility plans.
Expansion of Capacity, Programs, and Services throughout the
Service Area
CGTC must increase capacity because the demand for education and
training is growing rapidly, as shown by recent enrollment growth.
The areas population is growing, the areas employment
market is demanding a workforce with higher-level skills than ever
before, and the changing nature of work and technology are compelling
increased numbers of people to pursue postsecondary education, training,
and retraining. Therefore, to meet these demands, CGTC will need
new and expanded facilities in which to house additional and expanded
programs and services. Additionally, expansion of CGTC programs
and services in all seven counties in the service area will involve
delivering increased dual enrollment programs in collaboration with
secondary education by offering more high-demand technical instruction
in the counties high schools and in county centers. Moreover,
the expectation that credit enrollment alone will increase by 75%
by FY2007 necessitates corresponding increases in resources. Facilities
resources needed will include
- completion of the Roberta Center and Eatonton Center
- expansion of the Milledgeville campus facility ($10,152,380),
- renovation of rental property and the administration building
façade for forward expansion on the Macon campus ($5,539,019),
- retrofitting of Building H ($1,509,380)
- completion of an additional parking lot on the Macon campus
($919,960) and acquisition of 46 acres of land adjacent to the
campus ($3,500,000),
- completion of Building I on the Macon campus,
- construction of Macon and Milledgeville campus warehouse/distribution
centers ($1,360,800),
- construction of a Business Center on the Macon campus ($7,690,759),
- purchase of needed land ($1,500,000) and construction of an
Advanced Technology Center on the Macon campus ($13,974,000),
- rental and renovation, purchase and renovation, or construction
of facilities in Monroe County
expansion of instructional facilities in Wilkinson County
- inclusion of a health and fitness area in the Milledgeville
and Macon renovations, and
- funding for ongoing repair, maintenance, and replacement of
physical resources.
Additionally, each of the new/renovated facilities will require
equipment and other physical resources. New capital-equipment needs
(the equipment and furnishings needed for start-up) for the facility
improvements listed above will exceed $12,975,000.
It is projected that normal annual increases in enrollment will
generate a need for between $450,000 and $500,000 in new funding
for faculty and support personnel each year. Additionally, it is
projected that $1,750,000 in new funding for faculty and support
personnel will be needed when expanded facilities on the Milledgeville
campus and the Business Center on the Macon campus are opened.
Week-end College Concept
Offering a weekend college will make basic to advanced programs
and courses accessible to people who are unable to attend college
during traditional school hours. Initial weekend programs will include
high-demand TCC programs and industry/professional certification
programs in information technology and medical fields. The introduction
of the weekend college will require $905,416 for the first year
of operation including: four faculty members ($227,416), classroom
and laboratory equipment ($630,000), and facility rental in Monroe
County ($48,000). As the weekend college program grows, new costs
for faculty and equipment will be added to continuing costs from
the previous years.
Comprehensive Technology and Technology Infrastructure Improvement
Program
CGTC plans an extensive technology improvement project that addresses
five IT project areas:
1. systematic and ongoing technology and technology infrastructure
upgrades, replacements, and additions for all CGTC instructional
and operational programs and services;
2. technology and technology infrastructure catch-up
for the recently assumed adult literacy services;
3. technology and equipment upgrades for the library;
4. technology additions to meet the demands of increased enrollment
in new facilities; and,
5. improved use of information and information systems.
- IT Project 1 will require $65,000 for renovation of space
for technology operations, four additional technology support
positions in the first year ($120,000), one additional new technology
support position in the second year ($45,000), and one more additional
technology support position in the third year ($50,000). It will
also require $13,728,000 for technology and infrastructure upgrades,
replacements, and additions from FY2003 through FY2007.
- IT Project 2 will require one data-entry position in
the first year of operation ($33,000) and $911,120 for technology
replacements and additions, network installation, teleconferencing
capabilities among sites, and software for adult literacy services
between FT2003 and FY2007.
- IT Project 3 will require $135,720 for specialized library
technology replacements and maintenance contracts between FY2003
and FY2007.
- IT Project 4 will require approximately $4,720,000 for
technology for new facilities between FY2003 and FY2007. These
funds are included in the costs for capital equipment listed above.
- IT Project 5 , improved use of enterprise information
systems, will require one additional data-entry position in the
first year ($33,000) and an additional MIS coordinator position
in the second year ($48,000). The project will also require office
equipment and renovated office space ($18,300).
|
|